Franz Ehrlich, CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM (1959), Bauhaus Dessau Foundation. Reproduced for reference; rights reserved by the rights holder. See this canvas under a moving light: the drawing, the true colour under the varnish, the bare pigment

The facts

Artist
Franz Ehrlich topimpressionists.com/en/artists/franz-ehrlich/
Artist’s dates
1907 – 1984
Painted
1959
Medium
Ink On Paper
Original size
49 x 84 cm
Movement
Bauhaus
Period
Modern
Held at
Bauhaus Dessau Foundation topimpressionists.com/en/museums/bauhaus-dessau-foundation-dessau-rosslau/
Notable elements
Tables, diagrams, and charts
Subject or theme
Investment project construction schedule

In context

CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM — Franz Ehrlich

How big is it?

The original measures 49 × 84 cm (height × width), drawn here beside an adult of average height.

When was this painted?

  1. 1900
  2. 1910
  3. 1920
  4. 1930
  5. 1940
  6. 1950
  7. 1960
  8. 1970
  9. 1980

Row above: the years. Row below: how old the artist was at the start and at the end of each span — 0 at birth, 77 at death.

Painted when the artist was 52. The artist lived to 77. 27 of the 81 dated works by this artist in our catalogue came earlier.

Shaded: the lifetime of Franz Ehrlich (1907–1984) ▲ this work, 1959 every dated painting, decade by decade

First works: up to 1952 Main working years: 1952–1970 Late works: from 1970

Those three bands split the works this catalogue has a date for into a first quarter, a middle half and a last quarter. They are not the artist’s complete output: a thin stretch may be a gap in the record rather than a quiet spell. The same years with the artist’s life laid along them

Compare with

Pick one work above: name two things it shares with this one, and one thing that's different.

More works to set beside this one: topimpressionists.com/en/art/similar/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/

Colours

Measured from the image

    Main colour

    Gray #888571

    Catalogued palette

    • #888571
    • #6C6957
    • #414139
    • #7B7864

    These colours inside the artist’s whole palette Find other paintings by colour

    Palette
    Monochrome The dominant colour family in the image.
    Main colour name
    Gray
    Intensity
    Balanced How saturated and varied the colours are, from a single toned-down hue to many bright ones.
    Contrast
    Serene How much the colours differ in lightness and saturation across the picture.
    Harmony
    Unified Palette How well the colours work together, from clashing to fully unified.
    Brightness
    Bright How light or dark the picture reads overall, from deep shadow to bright highlight.
    Saturation
    Muted How pure and strong the colours are, from near-grey to fully vivid.

    Where in the world is this painting looked at?

    • under 1%
    • 1–3%
    • 3–8%
    • 8–20%
    • 20% and over
    This painting alone has too few recorded visitors to map, so the plate reads every work by Franz Ehrlich over the last twelve months — 4 countries in all. Where these figures come from

    The ten leading countries

    1. 1 China 83.8%
    2. 2 United States of America 10.8%
    3. 3 Hong Kong 2.7%
    4. 4 Japan 2.7%

    Find the three darkest countries on the map. Is the museum that keeps this painting in any of them? Write down one reason people far away might look at it.

    The 20 most looked-at works by Franz Ehrlich

    1. 1 Little house in a forest near Berggiesshübel (Floor plans, views, section and layout plan), 1947 8.1%
    2. 2 63 - 64 (Painting with violin, New Year, 1964 8.1%
    3. 3 Floor plan Sleeping room (with interior furnishings), 1962 5.4%
    4. 4 Painting with violin, 1979 5.4%
    5. 5 3 panels 72/51 5.4%
    6. 6 A.D.W. MAIN BUILDING 2 BASEMENT STOREYS 1RST WORKING DESIGN (Academy of Sciences, floor plan), 1976 2.7%
    7. 7 A.D.W. MAIN BUILDING GROUND FLOOR 1RST WORKING DESIGN V.2 (Academy of Sciences, floor plan), 1976 2.7%
    8. 8 A.D.W. MAIN BUILDING 1RST TOP FLOOR 1RST WORKING DESIGN (Academy of Sciences), 1976 2.7%
    9. 9 BASIC SCHEME FOR ROOM UNITS AND UTILISATION IN THE HV HOUSE (Trading House Berlin), 1974 2.7%
    10. 10 1 piece filing cabinet (with tubular steel feet and marble tabletop), 1981 2.7%
    11. 11 HKB II - NEW-BUILD 1RST TOP FLOOR (Ministry of the Interior, Berlin, plan view), 1950 2.7%
    12. 12 800 YRS. DAS BUCH [THE BOOK]. GROUND PLAN AND VIEWS (Exhibit display racks, Leipzig Trade Fair), 1964 2.7%
    13. 13 SALES COUNTER, 1957 2.7%
    14. 14 1rst Front door project (Baumann House, Berlin), 1962 2.7%
    15. 15 110.4% plan fulfilment in Leipzig. Report by Leipzig City Council (Brochure), 1949 2.7%
    16. 16 800 YRS. WALL 4 + 5. GROUND PLAN AND VIEWS (Exhibit display racks, Leipzig Trade Fair), 1964 2.7%
    17. 17 Bookshop Hauptstraße / Transversal section (FDGB Bookshop, 1949 2.7%
    18. 18 Table and chair for dining room, 1954 2.7%
    19. 19 800 YRS. BOX FRAME (Leipzig Trade Fair), 1965 2.7%
    20. — CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM, 1959 this painting 0.0%

    Together these works take 70.2% of all the attention this artist's paintings received over the last twelve months. The catalogue holds 101 works by this artist, of which 30 were looked at at least once. This painting has not been looked at yet in that time — it closes the list without a rank. The same counts, month by month

    Bars measure attention, not quality. Pick the work at the top and this one: name one thing that might make a painting famous beyond how well it is painted.

    About this artwork

    CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM — Franz Ehrlich

    The Precision of Progress: A Blueprint of Visionary Intent

    In the intersection of architectural rigor and graphic artistry lies a remarkable piece of mid-century documentation: CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM. Created in 1959 by the master of form, Franz Ehrlich, this work transcends its utilitarian origins to become a captivating study of order and anticipation. At first glance, the viewer is met with an intricate tapestry of tables, diagrams, and charts that map out the birth of a media space. It is not merely a schedule; it is a visual manifesto of structural possibility, where every line and cell serves as a heartbeat in the rhythm of industrial progress.

    The painting, executed on paper with a delicate yet commanding presence, measures 49 x 84 cm, offering a panoramic view into the meticulous mind of its creator. Ehrlich utilizes a technique that blends the precision of technical drafting with the expressive soul of graphic design. The composition is dense with information, yet it maintains a rhythmic balance that guides the eye through a labyrinth of data. For the collector or interior designer, this piece offers a sophisticated geometric complexity that serves as a stunning focal point in modern, minimalist, or industrial-themed spaces, providing a sense of intellectual depth and structured elegance.

    A Legacy Forged in Bauhaus Discipline

    To understand the soul of this work, one must look to the hands that held the pen. Franz Ehrlich was a product of the legendary Bauhaus Dessau, an institution that redefined the relationship between art, craft, and industry. Having studied there between 1927 and 1930, Ehrlich carried the avant-garde principles of functionalism and clarity into his later works. This specific piece, created decades after his formative years, reflects a matured mastery of the Bauhaus ethos—the idea that beauty is found in the most efficient and logical arrangement of elements.

    The historical context of 1959 adds a layer of profound gravity to the work. Living through the turbulent shifts of mid-century Germany, Ehrlich’s work often mirrored the tension between individual creativity and the collective necessity of reconstruction and planning. The subject matter—the implementation of TV studios—speaks to an era of burgeoning communication and the technological optimism of the post-war period. There is a quiet heroism in these charts; they represent the blueprint for a new way of seeing the world through the lens of emerging mass media.

    The Aesthetic of Order and Emotional Resonance

    Beyond its technical merits, the artwork possesses an evocative emotional impact that resonates with anyone moved by the beauty of logic. There is a certain serenity found in its absolute organization. The repetition of tables and the structured flow of diagrams create a meditative quality, inviting the viewer to lose themselves in the details of the project's timeline. It evokes a sense of nostalgia for an era when progress was measured in tangible, meticulously planned steps.

    For those seeking to adorn a curated collection or a professional studio, this reproduction offers more than just decoration; it offers a conversation piece that bridges the gap between historical documentation and fine art. The interplay of light and shadow within the intricate linework provides a tactile richness that makes every viewing a new discovery. It is a celebration of the architect's vision—a moment frozen in time where the future was being carefully, beautifully constructed.

    Artist and museum

    Artist

    Franz Ehrlich

    Born in Reuth, Germany

    early life and education

    franz ehrlich, a renowned german architect, calligrapher, and graphic designer, was born in 1907. his formative years were marked by an innate inclination towards the arts, which led him to enroll at the bauhaus in dessau from 1927 to 1930. this prestigious institution played a pivotal role in shaping ehrlich's artistic perspective, introducing him to the avant-garde movements of the time.

    artistic career and communist affiliation

    ehrlich's affiliation with the communist party had a profound impact on his life and career. in 1935, he was arrested and imprisoned by the nazi regime, an event that significantly altered the trajectory of his artistic pursuits. despite these challenges, ehrlich continued to contribute to the world of art, leaving behind a legacy that is both inspiring and thought-provoking.

    notable works

    some of ehrlich's most notable works include:

    800 yrs. das buch [the book]. ground plan and views (exhibit display racks, leipzig trade fair), a testament to his innovative approach to design and architecture.

    prof. dr. baumann house execution (foundation plan), showcasing his expertise in architectural planning.

    1933 (photo-sculptural advertising project), a unique blend of photography and sculpture, highlighting his experimental nature.

    museums and collections featuring ehrlich's work

    AllPaintingsStore.com features an extensive collection of ehrlich's works, including those mentioned above. the bauhaus dessau foundation (dessau-roßlau, germany) is also a significant repository of his artistic endeavors.

    legacy and impact

    franz ehrlich's contributions to the world of art are multifaceted, reflecting his broad range of interests and talents. his experiences, both creatively and personally, offer valuable insights into the intersection of art and politics during a pivotal moment in german history.

    view more of ehrlich's works at https://AllPaintingsStore.com/@/franz-ehrlich

    explore the bauhaus dessau foundation and its collection at bauhaus dessau foundation (dessau-roßlau, germany)

    Museum

    Bauhaus Dessau Foundation

    On show in Dessau-Roßlau, Germany

    A Legacy Forged in Experimentation: The Bauhaus Dessau Foundation

    Nestled within the meticulously restored Bauhaus building itself, the Bauhaus Dessau Foundation isn't merely a museum; it’s an immersive experience. Established in 1994 to safeguard and propagate the radical ideas of Walter Gropius’ legendary school, this institution stands as a testament to a pivotal moment in architectural and design history. More than just showcasing finished products, the Foundation delves into the process of creation – the interplay between art, architecture, technology, and social theory that defined the Bauhaus ethos. The building itself, a masterpiece of functionalist design, immediately establishes this atmosphere; its stark lines, expansive glass walls, and carefully considered spatial relationships invite exploration and contemplation. It’s a space designed to stimulate thought, mirroring the very principles championed by the Bauhaus movement.

    The Foundation's core mission is threefold: preservation, research, and education. It diligently maintains the building’s original fabric, ensuring that future generations can appreciate its groundbreaking design. Simultaneously, it conducts rigorous scholarly research into the Bauhaus’ diverse practices – from furniture design and typography to stagecraft and urban planning. And crucially, it offers a dynamic program of exhibitions, workshops, lectures, and performances, fostering dialogue between past and present, tradition and innovation.

    The Collection: Beyond Iconic Objects

    While iconic pieces like Marcel Breuer’s Wassily Chair undoubtedly draw crowds, the Foundation's collection extends far beyond these instantly recognizable symbols. It’s a remarkably comprehensive archive encompassing not just finished objects but also preliminary sketches, drafts, models, and correspondence – offering an unparalleled glimpse into the creative process itself. A particular highlight is the extensive documentation of the “Versuchsstätte” (experimental workshop), where students explored new materials, techniques, and spatial configurations under the guidance of master craftsmen and artists.

    Early Bauhaus Drawings:

    A remarkable collection of preparatory sketches reveals the iterative nature of design at the school – a constant process of refinement and experimentation.

    Furniture Prototypes:

    Witness the evolution of iconic designs, from initial models to fully realized pieces, showcasing the ingenuity and resourcefulness of Bauhaus craftsmen.

    Stagecraft & Lighting Designs:

    Explore the innovative use of light and space in theatrical productions, demonstrating the Bauhaus’ commitment to integrating art and technology.

    Architectural Models:

    Examine meticulously crafted scale models that illustrate Gropius' visionary approach to building design – a synthesis of form and function.

    Crucially, the collection isn’t presented as a static display; it’s integrated into broader exhibitions that contextualize each object within its historical and intellectual framework.

    Architecture as Art: The Bauhaus Building Itself

    The Bauhaus building itself is arguably the most significant artwork within the Foundation's holdings. Designed by Walter Gropius, it represents a radical departure from traditional architectural conventions – a testament to the Bauhaus’ belief in “form follows function.” The building’s open floor plan, expansive glazing, and carefully considered use of natural light create a dynamic and flexible space that fostered collaboration and experimentation.

    Beyond its aesthetic qualities, the building is also a remarkable feat of engineering – incorporating innovative technologies such as a central heating system and a sophisticated lighting design. It’s a living laboratory, constantly evolving through ongoing research and adaptation. The Foundation actively engages in preserving and restoring the building's original features while simultaneously exploring new ways to utilize its unique spatial qualities.

    Exhibitions & Events: A Living Dialogue with the Past

    The Bauhaus Dessau Foundation’s program of exhibitions and events is a cornerstone of its mission. These offerings aren’t merely retrospective displays; they actively engage with contemporary issues, exploring the enduring relevance of the Bauhaus’ ideas in the 21st century. Recent exhibitions have tackled themes such as sustainability, urban design, and digital culture, demonstrating how the Bauhaus’ principles can inform solutions to pressing global challenges.

    “Versuchsstätte Bauhaus. The Collection” (2019-2026):

    This landmark exhibition provides a comprehensive overview of the school's experimental workshop, revealing the diverse range of materials and techniques explored by students and teachers.

    Annual Bauhaus Festival:

    A vibrant celebration of Bauhaus culture, featuring concerts, performances, workshops, and lectures.

    Thematic Exhibitions:

    Regularly scheduled exhibitions explore specific aspects of the Bauhaus’ legacy – from furniture design to typography to stagecraft.

    Furthermore, the Foundation hosts a range of educational programs, including workshops for children and adults, offering hands-on experiences that connect visitors with the principles of Bauhaus design.

    A Unique Destination: More Than Just a Museum

    The Bauhaus Dessau Foundation transcends the traditional museum experience. It’s a dynamic research center, an architectural landmark, and a vibrant cultural hub – all rolled into one. Its commitment to preserving the Bauhaus legacy while simultaneously engaging with contemporary issues makes it a truly unique destination for art lovers, design enthusiasts, and anyone interested in understanding the profound impact of this revolutionary movement. A visit here isn’t simply about seeing objects; it's about experiencing an idea—the belief that art, architecture, and society can be profoundly intertwined.

    Where to read more

    Find this online

    QR code linking to the download page for CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM

    topimpressionists.com/en/art/download/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/

    Cite this artwork

    MLA
    Ehrlich, Franz. CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM. 1959, Bauhaus Dessau Foundation. https://topimpressionists.com/en/art/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/
    APA
    Ehrlich, Franz (1959). CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM [Painting]. Bauhaus Dessau Foundation. https://topimpressionists.com/en/art/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/
    Chicago
    Franz Ehrlich. CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM. 1959. Bauhaus Dessau Foundation. https://topimpressionists.com/en/art/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/
    Harvard
    Ehrlich, Franz (1959) CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM. Bauhaus Dessau Foundation. Available at: https://topimpressionists.com/en/art/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/

    Look closely

    CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM — Franz Ehrlich

    Look closely

    Answer in your own words. There are no wrong answers here — only answers you can explain.

    1. What catches your eye first, and why?
    2. Which colours or shapes create the mood — and what is that mood?
    3. Our catalogue files this work under: construction plan, tv studios, investment project. Do you agree? What would you add, or take away?
    4. Look back at 3rd FLOOR (Design for a foreign representation of the GDR. Floor plan), earlier in this guide. Name two things it shares with this work, and one that is different.
    5. Franz Ehrlich was about 52 when this was made. What in it looks like the work of an artist at that stage?

    Your response

    Write a short paragraph about this artwork. Use the facts from the earlier parts of this guide, and your answers above.

    Questions & Answers

    Can I see "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" by Franz Ehrlich on my own wall before buying?

    "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" has an augmented reality preview: the artwork's AR Preview page shows it in your own space on a compatible device.

    Who created "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" and what style is it in?

    "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" was created by Franz Ehrlich in the Bauhaus style. Artist and movement identify the work's tradition.

    Where and for what purpose is "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" recommended?

    "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" is suggested for theme, and the recommended space is an office.